Home Range Work
Posted: Mon May 01, 2023 12:40 am
It has been a while, but with the latest rain to soften that concrete pile that used to be excess dirt from the dam, I could do a little additional work on the berm on my range I built last fall. The Original dirt I put in front of the Berm Wall had settled a bit, which was to be expected, and I wanted to build up both height and thickness.
Using the Kubota L22501 and the loader, I began moving buckets of dirt from the pile and dropping them over the back of the wall onto the dirt berm, to increase the height. I probably dropped a dozen buckets. Then I looped around to the front of the berm and dropped another dozen or so on the front of the berm. So far I have concentrated on the right side of the berm, in line with the shooting lane. I can only do so much each day for a couple reasons...
1. The dirt in the pile has to have a certain amount of moisture to change from "Concrete hardness to workable." In that state I can cut and pull it with the bucket then scoop and load, and them transport and dump. Too little moisture, it's rock hard. Too much, it's puddin, and creates a suction that makes working with it too difficult without teeth on the bucket edge.
2. I have lower back issues from both careers, so I am limited to about an hour and a half to two hours on the tractor. Too long and I'll pay for the extra time for a couple days. No rush... the dirt and the berm will still be there the next day. We expect more dirt piles from a contract job in the next month or so... more dirt for the berm.
Progress so far. (The new dirt is darker.)
Using the Kubota L22501 and the loader, I began moving buckets of dirt from the pile and dropping them over the back of the wall onto the dirt berm, to increase the height. I probably dropped a dozen buckets. Then I looped around to the front of the berm and dropped another dozen or so on the front of the berm. So far I have concentrated on the right side of the berm, in line with the shooting lane. I can only do so much each day for a couple reasons...
1. The dirt in the pile has to have a certain amount of moisture to change from "Concrete hardness to workable." In that state I can cut and pull it with the bucket then scoop and load, and them transport and dump. Too little moisture, it's rock hard. Too much, it's puddin, and creates a suction that makes working with it too difficult without teeth on the bucket edge.
2. I have lower back issues from both careers, so I am limited to about an hour and a half to two hours on the tractor. Too long and I'll pay for the extra time for a couple days. No rush... the dirt and the berm will still be there the next day. We expect more dirt piles from a contract job in the next month or so... more dirt for the berm.
Progress so far. (The new dirt is darker.)