Over the past two days, the plumbers have been on site re-plumbing all the water lines. This afternoon we moved the restored vanity back into the bathroom and they plumbed that into place. They asked if it would be okay if they didn't color code the water lines in the master bath sink as they had run out of the blue line and it was the last phase of the job. :raised: I told them if was fine as long as the hot came out of the hot side and the cold came out of the cold side. :yes:
They began by running the lines up thru the access I had provided in the center of the vanity.

- water lines.jpg (118.64 KiB) Viewed 3726 times
Next they plumbed in the individual drain lines for the sinks and ran them to the center, and hooked up the sinks.

- drain lines.jpg (81.89 KiB) Viewed 3726 times
With those lines run, they could join the two and run them down into the center drain.... all neat and clean.

- main drain.jpg (114.47 KiB) Viewed 3726 times
Once everything was connected, we were able to put the drawers back in and the doors back on, and the project was finally done. Looks pretty good for something that should have been tossed in the dumpster and replaced.

- done.jpg (156.07 KiB) Viewed 3726 times
I am pretty happy with the outcome.